02 —— CAPABILITIES

What we can produce, in detail.

PRODUCTION CAPACITY
Category Daily Capacity Typical MOQ Lead Time Indicative FOB
Knit Tees 6,000 / day 1,000 pcs 60–75 days from $2.40
Polo Shirts 4,800 / day 1,000 pcs 60–80 days from $5.15
Hoodies 2,400 / day 1,000 pcs 70–90 days from $5.80
Sweatshirts 2,400 / day 1,000 pcs 70–85 days from $4.50
Woven Shirts 3,000 / day 1,000 pcs 70–90 days from $4.50
Pants 3,000 / day 1,000 pcs 70–85 days from $5.15
Denim 3,000 / day 1,000 pcs 80–100 days from $7.50
Outerwear 1,800 / day 1,000 pcs 80–100 days from $5.80
SEWING INFRASTRUCTURE

285 sewing machines across 7 lines.

Mix of Juki, Jack, Siruba, and Kansai industrial machinery. The breakdown below is the standing inventory; the configuration shifts by line based on style.

Industrial knit production machinery on a factory floor
ILLUSTRATIVE · STOCK
  • Single Needle Lock Stitch Juki / Jack ×160
  • Over Lock Juki / Siruba ×50
  • Flat Lock Juki / Siruba ×35
  • Button Hole / Stitch Juki ×10
  • Bar Tack Juki ×5
  • Snap Button Manual / Pneumatic ×10
  • Kansai Special (Multi-Needle) Kansai ×6
  • Feed-Off-The-Arm Juki ×3
  • Chain Stitch Juki ×2
  • Velcro / Eyelet Manual ×2
  • Zigzag Juki ×1
  • Blind Stitch Juki ×1
SUPPORTING MACHINERY
  • Cutting Machines (Straight Knife) ×6
  • Thread Re-Coning Machines ×3
  • Label Cutting Machine ×1
  • Iron Sets (Steam) ×24
  • Air Compressors ×3
  • Electric Boilers ×4
  • Generators (Standby) ×2
  • Vacuum Tables (Finishing) ×4
  • Cutting Tables ×5
FABRICS WE WORK WITH
100% Cotton CVC 80/20 Polyester Polyester Quick-Dry Mesh Single Jersey Pique Interlock French Terry Fleece Denim Linen Yarn-Dyed Stripes
EMBELLISHMENTS & FINISHES
Rubber Print Photo Print Pigment Print Crack Print AOP Stone Print Embroidery (basic) Garment Wash Enzyme Wash
WHAT WE DON'T DO

Honesty about scope.

We don't do leather, footwear, or hard accessories. For accessories like hangtags, labels, polybags, and packaging, we coordinate with our sister concern RL Accessories.

Have a tech pack ready?

We confirm feasibility within 48 business hours, including indicative FOB and lead time.

Send your tech pack